I have delivered many projects that involved changing servers and storage.

Migrating servers between data centres, installing new hardware,

decommissioning old hardware, upgrading operating systems.

 

There's not much I haven't done with servers.

___________________

 

Jan - June

2020

___________________

Jul - Dec

2018

 

 

 

 

 

 

 

 

 

 

 

 

___________________

Jul - Dec

2016

 

 

___________________

Jan - Jul 

2016

___________________

2012 & 2013

___________________

2012

____________________

 

TP ICAP

____________________

MS Amlin

____________________

MS Amlin

____________________

MS Amlin

 

____________________

 

Ladbrokes​

____________________

 

Ladbrokes​

____________________

Ladbrokes​

____________________

 

Ladbrokes​

___________________________________________________________________________________________

 

Application Migration and Decommission

Part of a larger data centre migration programme to vacate three data centres, bring a new one online and migrate applications to the AWS Cloud.  I was responsible for...

  • Lift and Shift of 20 applications from old OnPrem data centres to the new OnPrem. Mixture of physical migrations and vMotioning.

  • Working with the DBA team to upgrade Oracle databases from versions 11 and 12 to 19c and migrating the databases to a new infrastructure.

  • Migration of 80 SQL server databases to a new permanent SQL farm.

  • Decommissioning 43 applications.

___________________________________________________________________________________________

 

Migration of IT services from one IT support provider to another.

One Programme Manager, 2x Project Managers x 2x Support Partners

£750K budget

MS Amlin wanted to migrate all supported services and users from one outsource partner to another, to save £3m a year.  I worked on four streams of this programme:

  1. Network Changes;

    • installation of new circuits

    • VLAN renumbering & stretching

    • gateway migrations

    • various DMZ, firewall and F5 changes

    • decommissioning unwanted circuits
  2. Migration of the Citrix environment used by 150 staff

    • incorporating the build image into MS Amlin’s Citrix estate

    • customising the image to meet MS Amlin’s requirements

    • system testing and UAT of the Citrix application image

    • Planning the distribution of new RSA soft tokens and the inevitable support calls that would generate

    • all leading up to user cut-over to the new Citrix environment

  3. Upgrading user's hardware

    • Identifying changes that needed to be made to the desktop/laptop build​

    • Identifying the best approach to upgrade LAN-based and remote worker's hardware

    • Replacing Wyse terminals

    • Planning the upgrade of 150 user's hardware and communicating with the userbase

  4. Migration of infrastructure servers

    • Microsoft Exchange

    • Enterprise Vault

    • Domain controllers

    • File servers

___________________________________________________________________________________________

Removing performance bottlenecks on SAS application

Users were complaining about poor performance of their SAS environment. The root cause was their physical server was no longer fit for purpose. I managed the installation of the new hardware into a datacenter then the VMs were migrated to the new hosts. A cut-over point was agreed and the new server moved from UAT to PROD and the old server was decommissioned.

___________________________________________________________________________________________

Data warehousing

Installation and new HP 3PAR storage and a collection of the latest generation HP DL360, DL380 and DL580 servers were installed, for a storage transition and data warehousing project.

___________________________________________________________________________________________

Right-Sizing the IT Infrastructure for Grand National on 2012 & 2013

Typically a team of 10

£750K budget

Ladbrokes wanted their online and mobile platforms to stay operational on Grand National Day.

 

This is every UK bookmaker's busiest day of the year, the volume of bets are triple a normal Saturday and historically, all the bookmaker’s IT systems crashed on Grand National day due to volume.

 

I managed the analysis of every aspect of technology to identify weaknesses and resolve them. We created new customer journeys, made better use of existing F5 load balancers, introduced the use of AWS' Content Delivery Network to reduce the volume of data our web servers had to provide, right-sized database resources, all to try and keep the system operational.

 

In 2012, Ladbrokes online presence survived until one hour before the race started, but in 2013, the IT systems stayed up all day for the first time ever. I heard from ex-colleagues they still use the principles we developed in 2012.

 

Based on those experiences, I wrote a book about planning IT Infrastructure for large events (which you can buy on Amazon. Search for “IT Planning for the Grand National”).

___________________________________________________________________________________________

 

Reducing the time it took to refresh Test databases

Myself, 2x storage engineers

I reorganised Ladbrokes database infrastructure and deployed a new app for replicating production and test databases, to eradicate the loss of 5-10 days of testing each month, when Stage databases were refreshed using traditional backup and restore methods. The end-result was non-prod database refreshes took just 5 minutes.

___________________________________________________________________________________________

Performance improvement programme

I managed a programme of twenty-two projects to improve the performance and resilience of Ladbrokes production web servers, application servers, load balancers, firewalls and backups. The programme was delivered to plan & budget.

___________________________________________________________________________________________

Eradicating system bottlenecks

The BI system was running slowly and failing to produce reports to management on time. I managed analysis of the bottlenecks, deployment of more powerful hardware, OS and software upgrades and memory upgrades. The impact was production of BI reports became problem free and production time reduced by 2 hours.

 

 
 